Fumba | CPS City – Architectural Project Presentation

Project Location: Fumba Peninsula, Zanzibar
Client: CPS
Total Number of Buildings: 10

  • 8 Residential Blocks

  • 1 Tower Block

  • 1 Commercial Block


1. Project Vision

Fumba | CPS City is a mixed-use urban development located in the rapidly growing Fumba Peninsula of Zanzibar. The project aims to integrate residential, commercial, and social functions within a single masterplan, promoting a sustainable and vibrant coastal lifestyle.


2. Masterplan & Building Typology

Building Type Quantity Floors (∼) Gross Construction Area* Primary Function
Residential Block 8 G + 4 38,000 m² 1BR, 2BR, and 3BR apartments
Tower Block 1 G + 14 16,500 m² Residences, penthouses, fitness & lounge
Commercial Block 1 G + 2 6,000 m² Retail, offices, food court

*Approximate values; see BIM model for detailed quantities.

  • A central green spine connects all blocks via pedestrian pathways.

  • Vehicular traffic is directed to the perimeter road, ensuring car-free courtyards.

  • Seafront orientation and building gaps allow for uninterrupted views and natural ventilation corridors.


3. Residential Blocks (8 Units)

  • Modular floor plans accommodate multiple unit types within a unified structure.

  • Dual façade system enhances natural cross-ventilation throughout the day.

  • All buildings feature rooftop terraces with communal gardens, yoga decks, and sunbathing areas.


4. Tower Block (1 Unit)

  • The 14-storey residential tower offers 360° panoramic views of the sea and city.

  • Slender form reduces wind load; reinforced concrete core with steel framing.

  • The top floor includes a sky lounge and infinity pool, balancing public and private spaces.


5. Commercial Block (1 Unit)

  • Ground floor features a supermarket, cafés, and restaurants; upper floors provide co-working spaces.

  • Photovoltaic canopy on the roof provides shading by day and lighting by night.

  • Public plaza in front encourages integration with neighboring developments and pedestrian flow.


6. Sustainability & Construction Technology

  • Fully coordinated BIM (Revit) model used across all disciplines (MEP, structural, architectural).

  • Rainwater harvesting and greywater reuse system enables 35% water savings.

  • Local stone cladding and timber brise-soleil reduce long-term façade maintenance.

  • Targeting LEED Silver certification with 18% projected operational energy savings.


7. Transportation & Parking

  • 400-space underground parking garage, including electric vehicle charging stations.

  • Service and logistics traffic is separated from residential circulation routes for user comfort.


8. Project Timeline

Phase Date (2025) Status
Concept Design February Completed
Design Development April Completed
Permit Drawings July In Progress
Construction Start November Planned
Project Completion Q2 2027 Targeted

9. Conclusion

With a total built area of 60,500 m², Fumba | CPS City redefines the balance of residential and commercial life in Zanzibar. The integration of three complementary building types, a cohesive masterplan, and full BIM coordination across disciplines makes this development a model for long-term, sustainable urban growth in the region.

Task

Hotel

  • Date

    February 1, 2025

  • Skills

    Revit-BIM Coordination

  • Client

    BAO Construction

  • Project Location:

    Zanzibar City

  • Project Area :

    60.500 m²

  • Design By:

    BAO Construction