How does a project engagement begin?
expand_more
We start by reviewing your project stage, requirements, and available models or drawings, then align on scope, discipline responsibilities, inputs, and expected deliverables.
Which practice areas and software ecosystems do you work in?
expand_more
We deliver architectural design, ISO 19650 BIM coordination, Common Data Environment (CDE) workflows, interiors, and structural/MEP coordination with partner teams using Autodesk Revit (2023–2027), Rhino & Grasshopper, Dynamo, IFC, and our native C# add-ins Parametrically • Press and Solve Parametrically • Studio.
How are BIM consultancy and corporate Revit training structured?
expand_more
For public institutions, municipalities, design offices, and contractors, programs follow an ISO 19650, BEP/EIR, and CDE framework structured around a needs review, role-specific Revit training, pilot model application, and structured follow-up.
How are responsibilities defined across project disciplines?
expand_more
Design authorship, execution documentation, as-built updates, and each discipline’s technical responsibilities are agreed explicitly at project kickoff according to contract roles.
What is Parametrically’s experience in metro station and rail systems BIM?
expand_more
Since 2015, Parametrically has designed over 30 metro stations and served as architectural main contractor across 3 rail transit lines. Our rail portfolio spans Istanbul (Ümraniye–Ataşehir–Göztepe, Çekmeköy–Sancaktepe–Sultanbeyli, M7, Kağıthane–Cendere), Ankara (M2–M3, YHT Esenboğa, YHT Etlik–Ovacık), Gaziantep Metro Depot, and Algiers Metro, covering station BIM, tunnel egress, and 5D coordination.
How do you deliver industrial food manufacturing facilities and Scan-to-BIM projects?
expand_more
Demonstrated by the 6,118.49 m² (204-room, 5-storey) Tarihi Safranbolu Fırını Production Factory & Headquarters — one of Istanbul’s largest and most comprehensive modern food manufacturing facilities — we unify point-cloud Scan-to-BIM surveys with HACCP hygiene zoning (Low/Medium/High Care), 5 temperature zones (+22°C to -20°C), fire compartmentation, and execution documentation inside a single coordinated Revit BIM model.